The MACK Group

Emergency Clean-up of ACM Project

Asbestos abatement - Emergency Clean-up of ACM Project

Emergency clean-up of debris from ACM contaminated classrooms. Work was completed in less than a month without injury or incident. Asbestos abatement – Emergency Clean-up of ACM Project.

Asbestos Abatement of VAT and Mastic Project

NY Times Shot blasted floor

Remove and dispose 2,100 sf VAT & Mastic. Work was completed in a month without injury or incident. NY Times Shot blasted floor.

Asbestos Abatement of ACM VAT from Basement

Asbestos Abatement of ACM VAT from Basement

Removal and disposal of 10,200 SF of ACM VAT from Basement. Work was completed in less than a month without injury or incident.

Asbestos Abatement of VAT and Linoleum

Asbestos Abatement of VAT and Linoleum Project

Removal & disposal of 1,335 sf of VAT & 320 sf of linoleum from bedrooms & corridors located on 1st, 2nd & 3rd floors. Work was completed in less than a month without injury or incident.

A Large Rubber Flooring Removal Project

Asbestos Floor Tile Removal Services by The MACK Group, LLC

The MACK Group, LLC completed a rubber flooring removal project at a leading Newspaper located in Northern New Jersey.  The project consisted of the removal of approximately 30,000 sf of rubber floor mat adhered to concrete. The MACK Group was brought in because of the extreme difficulty in removing the rubber floor by previous attempts… Continue reading A Large Rubber Flooring Removal Project

Floor Covering Removal Project

Floor removal utilizing Terminator floor removal equipment

Floor removal utilizing Terminator floor removal equipment. Work was completed in 2 months without injury or incident.